Lunar Mission Delayed: The Engine Switch-Up
A lunar mission, backed by NASA, is facing a setback due to an engine change. The project, involving a lunar lander built by ispace U. S. , was initially set to launch in 2026. However, the switch to a new engine, called VoidRunner, has pushed the launch date to 2027. The original plan involved usi